Schedule

This is a schedule I have put together for work to be completed preferably between autumn and winter during the Winter Term: 25th of October - 17th of December.

The schedule above depicts only the pre-production phase within the project. Most of the concept work has been completed. All that remains are some refined character model sheets for the design of Frank. I would like to finish modeling, U.V. Mapping and Texturing before Christmas. This may however be a little optimistic. Although I hope to get these tasks done so that Term 2 can be dedicated to rigging and animation. Term 3 will be mainly Rendering, Compositing, Editing and Sound/ Post Production.